Asbestos Removal During Building Demolition in Pegasus, Calgary

Safely manage asbestos removal during building demolition in Pegasus, Calgary with expert planning and compliance to protect workers and the environment.

Call (587) 333-3284

Request An Estimate

Fill out this form and we'll give you a call within 24 hours to schedule a free on site consultation.

Thank you

Thanks for reaching out. We will get back to you soon.
Oops! Something went wrong while submitting the form.

Asbestos Removal During Building Demolition in Pegasus, Calgary

Demolishing buildings that contain asbestos requires strict safety protocols to prevent the release of hazardous asbestos fibers. If asbestos-containing materials (ACMs) are disturbed without proper precautions, they can contaminate the air and surrounding environment, posing severe health risks.

At Calgary Restoration, we specialize in certified asbestos removal during building demolition in Pegasus, ensuring full compliance with provincial and federal safety regulations while minimizing health risks and environmental contamination.

Call (587) 333-3284 for professional asbestos removal before demolition today!


Why Asbestos Removal is Critical Before Demolition

Buildings constructed before the 1990s often contain asbestos in insulation, flooring, walls, and roofing. When demolition occurs, these materials can be shattered, releasing hazardous asbestos fibers into the air.

Prevents Airborne Asbestos Contamination – Demolition can disturb ACMs, releasing harmful fibers into the environment.

Ensures Compliance with Health & Safety RegulationsFederal and provincial laws mandate safe asbestos removal before demolition.

Protects Workers & Nearby Communities – Uncontrolled asbestos release poses long-term health risks to workers and residents.

Avoids Legal & Financial LiabilitiesFailing to follow asbestos removal protocols can result in fines, lawsuits, and work stoppages.

Facilitates a Safer & More Efficient Demolition – Proper asbestos abatement reduces hazardous waste and project delays.

Before demolishing any building with potential asbestos, a professional asbestos inspection and removal process is required.


Our Asbestos Removal Services for Building Demolition

We provide comprehensive asbestos abatement solutions for residential, commercial, and industrial building demolitions.

1. Asbestos Inspection & Pre-Demolition Survey

  • Testing suspect materials for asbestos content.
  • Identifying and mapping all asbestos-containing materials (ACMs) in the structure.
  • Providing a detailed asbestos abatement plan before demolition begins.

2. Containment & Controlled Asbestos Removal

  • Sealing off asbestos-affected areas to prevent fiber release.
  • Using negative air pressure systems and HEPA air scrubbers to filter airborne contaminants.
  • Ensuring all abatement workers wear full personal protective equipment (PPE).

3. Safe Asbestos Material Removal & Disposal

  • Carefully removing asbestos-containing insulation, drywall, flooring, and roofing materials.
  • Using wet removal methods to prevent airborne asbestos fibers.
  • Transporting ACMs in sealed, labeled hazardous waste containers to licensed disposal sites.

4. Final Air Quality Testing & Site Clearance Certification

  • Conducting post-removal air monitoring to confirm asbestos-free conditions.
  • Providing official clearance documentation for demolition permits and compliance.
  • Coordinating with demolition teams to ensure safe site handover.

5. Asbestos Waste Management & Environmental Protection

  • Properly disposing of asbestos waste at government-approved hazardous material sites.
  • Following strict environmental regulations to prevent soil and water contamination.
  • Ensuring legal compliance with provincial and federal asbestos disposal laws.

Our Asbestos Removal & Demolition Process

Step 1: Asbestos Inspection & Hazard Assessment

We conduct a full asbestos survey and create a safe removal plan before demolition begins.

Step 2: Containment & Air Quality Control

We isolate ACMs and use HEPA filtration to prevent fiber release into surrounding areas.

Step 3: Asbestos Removal & Abatement

We safely extract and dispose of asbestos-containing materials following strict regulations.

Step 4: Final Air Testing & Site Certification

We confirm asbestos-free conditions before demolition proceeds.

Step 5: Demolition Support & Waste Disposal Compliance

We coordinate with demolition teams to ensure all asbestos is properly handled and removed.


Common Asbestos-Containing Materials in Buildings

Insulation (Walls, Pipes, Boilers, & Ducts)Used for fireproofing and heat resistance.

Floor Tiles & AdhesivesVinyl and linoleum tiles often contain asbestos.

Drywall & Joint CompoundsWalls and ceilings in older buildings may have asbestos.

Ceiling Tiles & Acoustic PanelsCommon in offices, schools, and commercial buildings.

Roofing Materials & ShinglesAsbestos was widely used in cement-based roofing products.

Cement Pipes & WallboardOlder plumbing and wall structures may contain asbestos cement.

HVAC Systems & Fireproofing MaterialsAsbestos was used in air ducts, gaskets, and heat shields.

If your building was built before 1990, an asbestos inspection is required before demolition.


How to Ensure Safe Asbestos Removal During Demolition

Conduct a Pre-Demolition Asbestos InspectionIdentify ACMs before beginning demolition work.

Hire a Licensed Asbestos Abatement ContractorDIY removal is illegal and highly dangerous.

Use Proper Containment & Safety ProceduresNegative air pressure and HEPA filtration prevent fiber release.

Follow Provincial & Federal RegulationsEnsure compliance with WorkSafeBC, OSHA, and environmental laws.

Dispose of Asbestos Waste SafelyAll ACMs must be transported to approved disposal sites.


Who Needs Asbestos Removal Before Demolition?

Commercial & Industrial Property Owners – Ensure safe demolition of old factories, warehouses, and office buildings.

Homeowners & Real Estate Developers – Remove asbestos before demolishing older homes and residential buildings.

Government & Municipal Buildings – Comply with health and safety regulations before tearing down structures.

Schools, Hospitals, & Public Facilities – Ensure safe asbestos removal before renovations or rebuilding projects.

Demolition & Construction Contractors – Work with licensed asbestos abatement teams to avoid project delays and violations.

If your building contains asbestos, professional removal is mandatory before demolition.


How Long Does Asbestos Removal Before Demolition Take?

  • Small buildings (residential homes, offices, single units): 1-3 days
  • Medium-sized buildings (apartment buildings, commercial spaces): 3-7 days
  • Large industrial or multi-structure demolitions: 7-14+ days

We work efficiently to keep your demolition project on schedule while ensuring complete asbestos removal.


Why Choose Calgary Restoration for Asbestos Removal During Demolition?

When it comes to safe, certified asbestos removal in Pegasus, property owners and demolition contractors trust Calgary Restoration because we provide:

Certified Asbestos Abatement Experts – Licensed in asbestos removal, testing, and regulatory compliance.

Strict Safety & Containment ProceduresProtecting workers, tenants, and nearby communities.

Government-Approved Asbestos Waste DisposalFollowing all provincial and federal regulations.

Advanced HEPA Filtration & Air Quality TestingEnsuring safe conditions before demolition.

Fast, Reliable ServiceMinimizing delays and keeping demolition projects on track.

Regulatory Compliance & Clearance CertificationProviding official documentation for legal and safety requirements.


Get Professional Asbestos Removal Before Demolition in Pegasus

Call us now at (587) 333-3284 for certified asbestos abatement.

Or Request an Estimate Online: https://calgaryrestoration.ca/request-estimate

Ensure a safe and asbestos-free demolition—schedule your asbestos removal service today! ️⚠